Week of 2/4/25: Installation of 4th floor wall panels is ongoing. Roughly 50% of the 4th floor panels had been set in place. Week of 2/4/25: Interior unit framing has progressed to the 3rd floor. Week of 2/4/25: Roughly 25% of the interior unit framing on the 3rd floor had been installed. Week of 2/4/25: Framing Week of 2/4/25: Framing Week of 2/4/25: Wood blocking has been installed in 1st and 2nd floor units in the areas of kitchen and bathrooms. Week of 2/4/25: Wood blocking. Week of 2/4/25: Tubs and showers have been installed in the 1st floor units. Week of 2/4/25: Pre-rock installation.